www.suez.fr

ARTICLE 19 – USE OF THE FOOTBRIDGE

 

The footbridge was installed to allow a continuity of progression around the Port and so that walkers could avoid taking the roadways.

 

The footbridge is therefore always in its closed position, that is to say, perpendicular to the Linquet, in order that pedestrians can cross it safely.

 

 

Back